Track Resource Hours and Job Progress from Field to Finance with Jugl + Sage Intacct

This article will explore how Jugl integrates with Sage Intacct to track resource hours and job progress from the field to finance

Updated over a week ago

Managing time entries, resource usage, and field updates across teams is always a challenge, especially in construction, where projects move fast, but data entry often lags behind. Operations teams are in the field. Finance teams are in the office. And connecting the dots between both can be messy.

  • Sage Intacct is your source of truth for financial records.

  • Jugl is where teams get their actual work done.

Instead of relying on manual updates, follow-ups, or texts like “Did we record this crew’s hours yet?”, this integration bridges both systems.

When done right, you get real-time job tracking, automated updates into Sage Intacct, and better visibility into how time and materials are being used.

Let’s look at how it works and how you can set it up for high-impact field-to-office coordination.

Table of Contents

  • Track Job Activity from Field to Finance with One Workflow

  • Define What Triggers the Flow from Sage Intacct

  • Connect Your Sage Intacct Account Securely

  • Let Jugl Push Updates into Sage Based on Task Status

  • Key Use Cases: From Daily Logs to Resource Accountability

  • Tips, Notes, and Best Practices

  • Summary and What’s Next

Track Job Activity from Field to Finance with One Workflow

The first flow is Sage Intacct → Jugl. It means any update in Sage, such as a new job, schedule, or approved timesheet, automatically becomes a task or subtask in Jugl.

This is useful when:

  • You want supervisors to know who is assigned where

  • You’re tracking material arrivals or deliveries

  • A new labor resource has been scheduled for a site

,Image A: App selection screen showing Sage Intacct as the trigger app

Why this helps:

Instead of calling or emailing the field team to say “materials are en route” or “this job’s ready,” Jugl creates a task: “Track Concrete Pour – Project X”, assigns it to the right person, and sets status and timing automatically.

Define What Triggers the Flow from Sage Intacct

The next step is choosing a trigger, what action in Sage Intacct should create a corresponding task or action in Jugl.

Some useful triggers include:

  • New or Updated AP Bill — used here to represent a resource booking, not a vendor payment

  • New Contact — for newly added subcontractors or crews

,Image B: Trigger options such as new AP payment

📝 Tip: If you’re tracking on-site resources (workers, suppliers, tools), you can treat a new Sage entry like a dispatch record.

Securely Link Your Sage Intacct Account

Now link your Sage Intacct account to the automation tool. This only needs to be done once.

,Image C: Sage Intacct connection setup window

📝 Note: Use a dedicated integration login with access to job tracking or resource modules only. This keeps the flow secure and scoped to the data you need.

Once this is active, you’re ready to move records from Sage into Jugl and prepare for two-way coordination.

Let Jugl Push Updates into Sage Based on Task Status

The second flow works in reverse: Jugl → Sage Intacct.

Imagine your field supervisor marks a task as “Completed” in Jugl. That task might represent a day’s work for a framing crew or delivery confirmation for construction material.

Instead of someone needing to re-enter that information into Sage, the system does it for you.

Here’s a typical setup:

  • Trigger: Task marked complete in Jugl

  • Condition: Task label = "Field Progress" or "Resource Log"

  • Action: Update Sage Intacct with time entry or material usage

,Image D: A task completion in Jugl triggers a status update in Sage

📝 Pro Tip: This automation can reduce 4-6 manual steps per job, per day.

Common Use Cases in Finance + Construction Teams

Here’s how teams are already using this two-way sync to reduce friction.

Use Case 1: Push Scheduled Work from Sage into Jugl

Step

What Happens

System

Job phase updated

New phase “Foundation Prep” added

Sage Intacct

Trigger runs

Recognizes schedule change

Integration

Task created

“Start Foundation Prep”

Jugl

Assigned to

Field Supervisor

Jugl

Task includes

Job ID, area details, expected crew

Jugl

Why it matters:

No one on site misses a step. They see what needs to be done, when, and where.

Use Case 2: Crew Logs Hours and Updates Sage Automatically

Step

What Happens

System

Task marked “Done”

Crew logs 8 hours for “Framing”

Jugl

Trigger runs

Label: “Labor Log” found

Integration

Entry created

8 crew hours on Job 2307

Sage Intacct

Why it matters:

No spreadsheets. No double entry. Sage gets verified work hours and is linked to the correct job.

Use Case 3: Track Material Usage and Push to Sage

Step

What Happens

System

New task in Jugl

“Track Gravel Delivery – Site B”

Jugl

Field logs quantity used

Supervisor enters 4 tons delivered

Jugl

Trigger runs

Completes with label “Material Log”

Integration

Sage updated

Adds to job material usage record

Sage Intacct

Why it matters:

Accurate field-to-finance tracking without chasing paper logs.

Notes and Best Practices

Keep it simple to start, try logging field hours for just one job.

Use consistent labels like “Labor Log” or “Material Entry” in Jugl.

Pilot in one department (like site operations) before scaling across all crews.

Field adoption matters: Make it mobile-friendly and ensure it takes less than 2 minutes to update a task.

📝 Note: Jugl is designed for crews who don’t want to “learn software.” It works right from mobile with checklist-style tasks.

Summary and What's Next

When Sage Intacct and Jugl work together, project updates don’t stay locked in whiteboards or WhatsApp groups. They become structured data, tied to jobs, tracked in real time.

For field-heavy industries like construction, this means:

  • Faster job progress reporting

  • Trusted job cost data

  • Less back-and-forth with finance

  • Everyone knows what’s done and what isn’t

Whether it’s tracking labor hours, material usage, or project milestones, this integration delivers clarity where it’s needed most: on the ground.

Next steps:

  • Choose one active project

  • Set up one field log flow

  • Let Jugl handle daily updates

  • Review job data weekly in Sage Intacct

You're no longer just closing books, you’re managing work in motion. Let Jugl and Sage Intacct make that real.